Back to Digests Week of July 5 - July 11, 2026

Week of July 5 - July 11, 2026

Re-entry week after ISTELive Orlando. Back in the saddle Mon Jul 6 after a week fully OOO (conference Mon–Wed, AI Flash Lab session Wed Jul 1, PTO Thu–Fri). The week has a light meeting load — the one heavy day is Tuesday, when the monthly cadence stacks up (End-of-month wrap-up → AS:DE → AI Learning Day planning, all back-to-back). Everything parked during OOO now comes due: GPS forward goals, June monthly Airtable, the Q2 logic-model quarterly, strategic-horizon refresh, and the Latvia MOU. First job is capturing ISTE impact while it’s still fresh.

Weekly Focus

From annual goals and the OOO re-entry context

  • Work the parked re-entry queue. GPS forward goals (drafted, Jun 30 deadline landed during OOO), June monthly Airtable + Q2 logic-model quarterly (both punted to early July by design), strategic-horizon refresh (overdue since April), Latvia MOU. Confirm sequencing with Josh in Thu 1:1.
  • Land the end-of-month cadence Tuesday. The wrap-up convo + AS:DE both fall Tue — the 30-day documentation cycle needs Airtable reconciliation, tag coverage, and 2–3 emerging stories. This is Goal 1 (tag meetings + 75% tag coverage). Bring the June deliveries (SMCOE PD, DCI Flash Lab) and the ISTE moments.
  • Capture ISTE impact before it fades. The Wed Jul 1 Flash Lab session was the Goal-3 national-stage showcase. Log attendee reactions, any Joseph South / Jessica Garner / Nadia Selim conversations, and licensing/TTT movement into Airtable + quoted-impact.md now — this is the headline June/July story.
  • AI Learning Day (Jul 28/29) kicks off. New internal ask: planning meeting Tue for the Accelerator team’s AI PD day (Marlene Castro organizing, Gregory + Josh). Reuben facilitating.

Daily Log

Sunday, July 5

  • — (no work; OOO tail / holiday weekend)

Monday, July 6

  • Back from OOO. Re-entry: triage inbox + Slack from conference week, orient on the parked queue. No Stanford meetings.

Tuesday, July 7

  • (to be recorded) — heavy day: end-of-month wrap-up, AS:DE, AI Learning Day planning

Wednesday, July 8

  • (not yet recorded)

Thursday, July 9

  • (not yet recorded) — Josh 1:1

Friday, July 10

  • (not yet recorded)

Saturday, July 11


This Week’s Calendar

Stanford work calendar + real external work commitments. Personal-calendar items (River, 100x, CAP, chiropractor/dental, personal review) intentionally omitted.

Day Time (PT) Event Notes
Mon Back from OOO Re-entry triage. No meetings.
Tue 10:30 AM End-of-month wrap-up convo Josh + Reuben (this is the monthly check-in Josh moved back a week from Jun 30). Joe OOO in Ireland until ~Jul 13. Close the 30-day cycle, reconcile Airtable/tags, surface 2–3 stories. Bring ISTE + June deliveries.
Tue 11:00 AM AS:DE Meeting Josh + Reuben (Joe away). Regular weekly.
Tue 1:00 PM AI Learning Day planning Marlene Castro, Gregory Wilson II, Josh. Accelerator team AI PD day, Jul 28 or 29 (TBC).
Thu 10:00 AM Josh ↔ Reuben 1:1 Confirm re-entry queue sequencing: GPS goals, monthly Airtable, Q2 quarterly, Latvia MOU, strategic horizon.

Tuesday is the whole week’s center of gravity — three work meetings back-to-back. The rest of the week is open work time to clear the parked queue.


Key Upcoming (Beyond This Week)

Date Event Prep Needed?
Jul 28 or 29 AI Learning Day (Accelerator team PD) Yes — planning starts Tue Jul 7; Reuben facilitating.
Aug 1 Kellie / PCOL3888 Flash Lab integration + measurement Cogniti-in-Canvas, wager-vs-comfort logbook (Fizzy #142). Kristen advising, Josh coordinating.
October Latvia Flash Lab (Riga) — Josh + Reuben MOU to finalize (fee + signing entity, OTL review, #139); design 2-day Flash Lab (#138); book Riga travel (#140); define research-collaboration contribution (#141).

Action Items Status

Critical This Week (Re-entry Queue)

  • GPS forward goals — finalize/submit (drafted; Jun 30 deadline landed during OOO). Confirm submit posture with Josh Thu. (80eacc95, b4acd418)
  • June monthly Airtable — one record per active project; needed for Tue wrap-up. Includes SMCOE PD, DCI Flash Lab, ISTE.
  • Q2 logic-model quarterly review — Q2 close; parked to early July.
  • Add Quoted Impact to Airtable — sofIA, Dan/Josh Q2, DCI thank-yous, + ISTE session moments (qi-apr21).
  • Strategic Horizon refresh — overdue since April; knock out this week.

In Progress / Parked

  • Latvia MOU — fee posture + signing entity + OTL review (#139); design Oct 2-day Flash Lab (#138); book Riga travel (#140); define research-collaboration contribution (#141).
  • Jaylen Pittman / Roy Pea offline AI playground — Pi 5 mirror, Firebase logging, student audit log, UI tweaks (#121)
  • SofIA security doc → Sergio + Micaela; auth flow + DB schema (sofia-security-doc, e5f6a7b8)
  • AS one-pager + services tear sheet w/ Darcy (f8953e6f, 8f13265e)
  • Workshops Google Sheet sync (#119) — SMCOE + DCI rows still not pushed to the shared Sheet

Waiting On Others

  • Marily / Caitlin: IRB feedback on Health Coach Bot (still owed; 104 days cooling)
  • Josh: Latvia MOU routing (Karin/Isabelle), Darcy one-pager feedback
  • Brooke (OTL): Geoff Cox + YouCubed contract precedent
  • Nadia (ISTE): post-session next steps (likely discussed in person at ISTE — capture outcome)

Carried From Last Week (OOO)

  • Reply to Cathy Chase (3 comments) + Paige Teamey on interview_data_processed sheet (#128)
  • Cyan DeVeaux — commit (Kerns + Tech Interactive intros) or formally pause. Still rolling.
  • Date the four undated headings in running-notes.md so the ETL parser stops dropping them
  • Verify pre-OOO closures cleared: Jessica Tsang 14 feasibility reviews (#131), Mural OKR vote (#136)

Week’s Accomplishments

Cumulative — updated as the week progresses

  • Delivered ISTE AI Flash Lab session (Wed Jul 1, Orlando) — national-stage showcase with Josh. Went as well as conditions allowed (last-day morning slot, open-air come-and-go space, ~20 at peak); several attendees said “this is the best thing I’ve done at this conference.” (carried from OOO week)

Decisions Made

(Updated as the week progresses)

Cooling Connections

Auto-surfaced from etl_cooling at 21-day threshold. Reuben decides re-engage / check in / drop.

Likely resolved in person at ISTE last week (log the interaction to reset the clock):

  • Joseph South — 41 days by the clock, but on-site at ISTELive. If you talked (hallway or session), log it. [BRIDGE-BUILD]
  • Wen Profiri — 41 days by the clock, but the MyBook thread was active in mid-June. Treat as resolved.

Re-engage on return:

  • Marily Oppezzo / Michele Patel — 104 days. Health Coach Bot; IRB feedback owed from their side. One-line nudge now that you’re back.
  • Christine Bywater — 39 days. Active (SMCOE / Tinkery). Not dormant — normal check-in.
  • Preetha Krishnan Menon — 40 days. Confirm context before reaching out.

Clean dormant / drop unless something concrete surfaces:

  • Rachel Wolf (112d), Ana Saavedra (146d), Bernardo Silveira (137d), Victor Lee (137d — re-touched in person at DCI Jun 5, resolved), Victoria Delaney (137d), Vanessa Monterosa (158d), Anna-Lena Neurohr (159d).

Stories/Impact to Capture

Candidates for Airtable or quoted-impact.md

  • ISTE AI Flash Lab session (Wed Jul 1) — national-stage delivery of the Flash Lab format with Josh. Attendee reactions, ISTE-leadership quotes, follow-on interest = the headline June/July impact story. [SCALE-MOMENT] / [VALUE-VISIBLE]
  • ISTE relationship-building — any movement with Joseph South / Jessica Garner / Nadia on licensing or TTT next steps. [BRIDGE-BUILD]
  • June deliveries owed in Airtable — SMCOE PD, DCI Flash Lab, DCI thank-yous — capture in the early-July monthly entry.

Carried to Next Week

(Updated at end of week)


Created: 2026-07-06 (Monday). Re-entry week after ISTELive Orlando OOO. Light calendar — Tuesday stacks the monthly cadence (end-of-month wrap-up, AS:DE, AI Learning Day planning); Thu is the Josh 1:1. The week’s real work is clearing the parked re-entry queue (GPS forward goals, June Airtable, Q2 quarterly, strategic horizon, Latvia MOU) and capturing ISTE impact while it’s fresh.

Source: week-of-2026-07-05.md